- March 29, 2024
Finished up March 2018 with this Treated Pine Deck, Stairs and Balustrading. All materials had to be moved up through the Elevator and hallways as this project was in a unit block. We had to get everything precut to 1.8mtrs and build the Deck from 1.8mtr lengths. This is the reason for the different Deck board layout.
Project Type | Deck and Stairs |
The Lukonov Family | Cooparoo, Brisbane |
Completion Date | March 2018 |
Project Size | 30m2 |